See Your Order Before It Ships

Most buyers find out what they bought when the container opens. Lansen buyers find out before it leaves Foshan. Every order ships with an audit pack — four documents from your actual production run — and any unit that fails stays in our factory, not in your warehouse.

The Wrong Place to Discover Problems

By the time a window is inside a sealed container on the water, a mis-measured sash or a missing argon fill is already a claim: freight back, refabrication, a project schedule slipping. The economics of quality control only work at the factory — which is why Lansen inspects before packing, not after arrival, and why the evidence travels to you while your order is still on our floor.

The Four Documents in Every Lansen Audit Pack

  1. Production-floor video walkthrough. Your units filmed at every key stage — cutting, thermal-break assembly, glazing, hardware — so you see the work, not a stock video.
  2. Signed dimension sheets. A QC inspector measures every unit against your schedule and signs the sheet; tolerances are printed on the sheet, not implied.
  3. Glass documentation. Every lite carries a sticker naming the glass manufacturer, coating, and production date — traceable, not anonymous.
  4. Random hardware pull-out report. A random sample of units gets hardware operated and photographed — the sample is drawn by QC, not by the production line.

The 12-Point Pre-Shipment Checklist

# Check Evidence you receive
1 Overall dimensions Signed sheet
2 Squareness / diagonal Signed sheet
3 Thermal-break continuity Video
4 IGU build (glass / coating / spacer / argon) Per quote, glass sticker
5 Hardware function Pull-out report
6 Multi-point lock alignment Photo
7 Finish film thickness / color vs. approved chip Readings
8 Water tightness Test record
9 Air infiltration Test record
10 Screen fit Photo
11 Labels / customer branding Per packing list, photo
12 Crate packing & container record Loading photos

A failed check means a rebuild, not an apology. Any unit that misses a line on this checklist is corrected or remade in Foshan before loading — and you get the re-inspection video too.

How Your Audit Pack Reaches You

The pack is sent before the container loads, while there is still time to act on it. You review the video and dimension sheets against your schedule, flag anything that looks off, and our QC team answers with footage from the floor — not with a sales explanation. Only after your sign-off does the order move to loading.

Built on Documented Processes

The checklist is not a courtesy — it is the last step of a documented production process. Lansen runs written SOPs from raw material to finished unit, with dedicated quality inspectors who report outside the production line. The same standard covers aluminum windows, doors, sunrooms, and skylights — and the same audit pack backs every OEM order carrying your brand.

Inside the Lansen Factory

Production happens under one roof at our Foshan plant — profile storage, fabrication stations, glazing lines, and a dedicated QC area. The photos below are from our production floor, taken during a routine working day.

Aluminum window production line — Lansen factory, Foshan
Assembly stations for aluminum windows — Lansen factory, Foshan

Seeing the process is part of the audit: your pre-shipment pack includes a production-floor video walkthrough of your own units, filmed on these same lines. Ask for the full factory video with your quote.

Send Your Schedule →